Edited yet again with Day 4. You won't see much of Archie over this week because I am currently working as 1st AC on a high-budget production being filmed in a full studio lot (Scotland's equivalent of Hollywood.)
It's a horror film, so there are loads of night shots and as such the hours are crazy. Some days I'll be sleeping at the studio.
I'll be taking photos every day.
It's so surreal. There's an entire fictional Glasgow street built here. It looks totally believably until you go in the houses and just find plywood.
Here's one of the studio buildings. There are six of them and each one has anywhere up to 30 different "room" locations inside. From pubs to bedsits.
Let me know what you want to see in the comments. I have not had to sign an NDA (this is the first production I've worked on since I started making money in this industry that I can show you everything).
DAY TWO"- Inside views of indoor sets."
"- More shots of that good looking blonde. :P"
Also, we're shooting in 4.5k. HD is 1080. An xbox360 is 720. 4.5
thousand.
I was really busy today so I didn't get a spare moment to go around other departments, sorry Captain Terror.
More tomorrow.
DAY 3!Crazy busy today. We were behind schedule due to heavy rain, so I've been non-stop for about 10 hours. So tired ;_;
It's so much easier to work in rooms without ceilings.
This little thing was awesome. Basically a jet engine to rapidly heat the room. Literally.
It wouldn't be a horror film without a mad lassie cutting up a paint canvas.
Big 300mm lens on.
This was a rehearsal. The mat had to be removed for the take. I do not envy this guy having to lie in rainwater in temperatures of around -2 C.
The 7k bulb returns.
DAY 4!